New Chemical & Catalyst Pipeline

Industry: Petrochemical

Study Date: December, 2025

Installation of new chemical process line, mainly used during plant TA to quickly and safely recover the chemical back to polymer column reflux tank.  Previous practice using flexible hose connection leaves a risk of chemical leaking at the multiple flexible joint connecting more than 30m length.

Compressor Flare Line Modification

Industry: Petrochemical

Study Date: August, 2025

Installation of new pipeline to safely discharge excess process gas on reciprocating compressor to flare line. This installation is designed to comply with DOE requirement.

Brine Pipeline Modification

Industry: Petrochemical

Study Date: July, 2023

Designed and installed 2 (two) units of bucket strainer for brine pump suction pipeline (duplex type strainer)