E&i work

Flowmeter Installation & Piping Modification

Industry: Petrochemical

Study Date: January, 2025

Pipeline modification to allow for an installation of one unit of magnetic flowmeter, at a WWT pump discharge line. Hydraulic calculation and internal pipeline pressure loss were calculated during the engineering phase. Straight pipe length requirement before and after the flowmeter position was taken into careful consideration during the design stage, while navigating the tight available space available for the modification.